A finished custom home in pale whitewashed brick with a charcoal metal roof among live oaks in the Texas Hill Country at dusk
Design-build · Austin & the Hill Country

Built course
by course.

One crew designs and builds your home, on a tight city lot or forty acres of live oak, from the first brick to the last key.

Phase 02 · Masonry

Every brick laid by hand, every course checked.

Limewashed Texas brick, set on a slab poured to a tolerance of an eighth of an inch.

Phase 03 · Framing & roof

A roof made to outlast the mortgage.

Douglas fir trusses under a standing-seam metal roof rated for Texas hail and a fifty-year finish.

Phase 04 · Finish

Then the light comes on.

Steel windows, white oak, a pool set into the limestone. Built around the oaks we promised to keep.

Day 287.
Welcome home.

We take on twelve homes a year, so each one keeps the same crew from slab to keys.

Est. 2009 · East Austin Brick · Steel · Timber

Homes delivered
0
Years building Austin
0
Trades kept in-house
0
Keys handed over on the promised day
0%
On site now · Austin

Three homes
going up today.

Every client gets a site log, posted every Friday with photos, the schedule and the money spent so far. Here is this week, as it went out.

Finished homes · 2023–2026

Keys handed over.

Four of the last twelve. Three on city lots most builders called too tight, one on a ridge in the Hill Country.

    Pencil elevations and a floor plan on tracing paper with brick samples The first courses of pale brick on a fresh slab A brick gable rising course by course Timber roof trusses over finished brick walls The finished home at sunset
    How a Coursework home gets built

    Five phases.
    One crew.

    00 · Lot & drawings · 10–14 weeks

    We walk the lot before we draw a line.

    Survey, soils, setbacks and every tree worth keeping. Our architects draw around them, and you sign one fixed price before any dirt moves.

    • Fixed-price contract
    • Permit set
    • 3D walkthrough
    01 · Foundation · 6 weeks

    A slab poured to an eighth of an inch.

    Post-tensioned for Austin clay, checked with a laser level at every pour. Plumbing goes in before the concrete, so nothing gets cut out later.

    • Engineer sign-off
    • Pre-pour walk with you
    02 · Masonry · 10–12 weeks

    Our masons. Never a sub.

    Every course is laid to a string line by the same four masons who started the job. Limewash goes on by hand, and it gets better with every year of weather.

    • Mock-up wall approval
    • Brick from 140 miles away
    03 · Frame, roof & envelope · 10 weeks

    Dried in before the first storm.

    Fir trusses, a standing-seam roof, steel windows set and flashed. Then a blower-door test, because a tight house costs less to run every month you live in it.

    • Blower-door report
    • Window water test
    04 · Finish & keys · 12–16 weeks

    Oak, stone, and a punch list of zero.

    Floors, millwork and stone go in by our own carpenters. We walk the house with you room by room and hand over keys only when the list is empty.

    • Home manual
    • 10-year structural warranty
    Materials we stand behind

    Four things
    we never swap.

    Cheaper versions of all four exist. We have torn enough of them out of other builders' houses to know what they cost you later.

    Handmade clay brick under an uneven limewash
    01

    Handmade brick

    Fired in a Texas kiln 140 miles away, limewashed on site by hand.

    Load-bearing · 100+ yr life
    Blackened hot-rolled steel plate with a ground weld
    02

    Blackened steel

    Hot-rolled windows, stairs and lintels welded in our own shop.

    Thermally broken · 1/4" plate
    Reclaimed heart-pine beam with old nail holes
    03

    Reclaimed heart pine

    Beams pulled from Texas warehouses built before 1920, milled to size.

    Longleaf · 12+ rings per inch
    Chopped-face Texas cream limestone blocks
    04

    Texas limestone

    Chopped-face cream stone from Central Texas quarries for walls, steps and pools.

    Quarried under 90 miles away
    A worn trowel, jointer and level resting on a fresh course of pale brick

    “We don't sub out the brick. Not on the first house, not on the hundred and twelfth.”

    Wes Calder · Founder, mason since 1998
    Ballpark in a minute

    What would
    yours cost?

    Real numbers from our last twenty-four homes. Not a quote, but you will know whether we should talk.

    Where is the lot?
    Size 3,200 sq ft
    Finish level

    Steel windows, white oak floors, limestone kitchen.

    Add
    Estimated build cost
    $0to$0
    Build time0 months
    Crew on your job0 people
    Send this estimate to Wes

    Excludes land, design fees and permits. Based on 2025–26 Coursework builds.

    In the contract, not the brochure

    Four promises
    we sign.

    1. 01

      One fixed price

      Signed before we break ground. If we got a number wrong, that is our problem, not yours.

    2. 02

      A log every Friday

      Photos, schedule and every dollar spent, in your inbox by 5 p.m. for the whole build.

    3. 03

      The same crew

      The superintendent who pours your slab is the one who hands you the keys.

    4. 04

      Ten years on structure

      Foundation, masonry, framing and roof, backed by us and a third-party insurer.

    From people who live in them
    “Our lot was 38 feet wide with a heritage oak in the middle. Two builders said tear it down. Wes drew the house around it.”
    Dana & Luis R. · The Holly House, East Austin
    “I read the Friday log with my coffee for eleven months. There was never a week I didn't know where the money went.”
    Priya K. · The Courtyard House, Hyde Park
    “We moved in on the date they gave us a year and a half earlier. To the day. Nobody believes us.”
    Tom & Ellen W. · Oak Ridge, Dripping Springs
    01 / 03
    An old brick warehouse workshop with steel doors rolled open and oak boards stacked inside
    The studio

    An old brick
    warehouse on
    East 5th.

    Architects upstairs, the steel and timber shop downstairs, the brick yard out back. Thirty-one people, nine trades, and a rule that whoever draws a detail has to watch it get built.

    Come see a mock-up wall, hold the steel, walk a house we're building. Saturday mornings by appointment.

    East 5th St · Austin, TX 78702
    (512) 555-0187 · Mon–Fri 7:00–17:00
    Questions

    Before you
    call us.

    Can you look at a lot before we buy it?

    Yes, and we'd rather you did. A feasibility walk covers setbacks, soils, trees, utilities and a rough budget. It costs $1,500, credited to your contract if we build.

    How can the price be fixed?

    We spend ten to fourteen weeks on drawings before we price, and most of the work is done by our own people. Fewer subs means fewer surprises. Changes you ask for are priced in writing before anyone does them.

    Can we bring our own architect?

    About a third of our clients do. We join early, price as the drawings develop, and our in-house team handles the construction details.

    How many homes do you build a year?

    Twelve: usually eight on city lots and four in the Hill Country. Our calendar is currently booking ground-breaks for late 2027.

    What does the warranty cover?

    One year on everything, two years on systems, ten years on structure: foundation, masonry, framing and roof. We come back at month eleven to fix anything that settled.

    Start a home

    Tell us about
    the lot.

    Wes reads every one of these himself and calls within two business days.

    Step 1 of 3

    Where would you build?

    Roughly what are you planning?

    Where should Wes call you?

    Received

    Thank you. Wes will call within two business days, usually from the job site, so forgive the noise.